Description:
1.1 Work Scope
Hardware installation: All support works are to meet laboratory's testing needs, equipment installation standards and test line environment.
- Equipment installation and movement, average 15000 items/ year, in 2000 racks in labs
- Receive tasks via JIRA ticket, confirm request with users;
- Pick up requested equipment from storage rooms; request in system and pick up consumable materials;
- Carry equipment and materials to lab areas; upload equipment to requested chassis in rack; secure equipment in chassis with screws;
- Rack alignment and plate fixing to be done
- Connect equipment with cables, average 07 cables connectivity to each equipment
- Confirm the installation is according to installation standard of different type of rack or products
- Verify connectivity and confirm the completion of the task in JIRA ticket, inform users about the progress of the tasks;
- Long Cable laying from Lab to Lab on cable tray /fall ceiling
- Update equipment status and location information in ONELAB system.
- Equipment uninstallation and return to inventory, average 10000 items/ year
- Receive tasks via JIRA ticket;
- Disconnect cables from the equipment, disconnect equipment from other equipment in racks, pull equipment from racks;
- Carry equipment to storage rooms;
- Update equipment status and location information in onelab system.
- Disconnected cables to be removed from cable trays/racks and to be handed over to Store room.
- Inspection and report of lab environment, total 20 Labs areas in 02 Buildings
- Weekly inspections and report in all lab areas on safety temperature, humidity, noise and radiation
- Lab cleanness to be maintained by removing unwanted connections/materials as and when required
- Keep a record and report abnormal issues;
- Track and follow up correction actions on abnormal issues.
- Major activities carried out on daily basis
- HW Operations & Maintenance Operations
- RF connectivity
- PC/VM/OS installation and configuration of all variants Eg: Windows /Linux
- Server installation and configuration Eg: VMWare, KVM and other Hypervisors
- New firmware (NE/server/measurement equipment)
- HW Replacement / Reconfiguration / Labelling / Documentation / Cable Channels / routing
- LAN Interconnect Cables / Fibre Optic Interconnect Cables with proper dressing & labelling
- GPS Installation and connectivity
- LAN cable crimping
- Equipment & connectors Soldering
- Network switch installation and configuration
- Documentation of BTS/Servers/Switches Port details